NEW CLEVELAND RD – TINGALPA

NEW CLEVELAND RD – TINGALPA

NEW CLEVELAND RD – TINGALPA

sample_0017_18.jpg

The design and construction of a new 2,500m2 warehouse and ancillary office complex consisting of 3 individual tenancies with large warehouse storage facilities, heavy duty pavements areas and light duty car park area along with pre-cast panel retaining structures, services, landscaping and polished concrete feature panels.

The building structure itself comprises of a structural steel framed construction with pre-cast panels to form the exterior shell, including polished concrete feature façade panels, which were custom created in the corporate colours of Nairn Constructions sister company Manly Concrete. Nairn Constructions also installed a new 600mm diameter stormwater pipe for new up-stream connections. Approximately 1,500m3 of CBR was required to raise the external car park platform and the site required in excess of 30,000L of rainwater retention.

This was achieved through installing two underground concrete tanks (20,000L and 10,000L). The site was strategically planned so not to affect the individual operations of each warehouse. The main office areas consisted of polished concrete flooring, shop front glass offices and polished concrete and timber stairs.

Project Value:          $2.7M

Client:                        Rubrae Trust

Year Completed:     March 2013